Handing over a new sewer line: inspection, records and the warranty

What to get when a new sewer line is finished: the inspection record, the after-video and what to look for in it, the as-built, and how to read the warranty.

A conceptual restored sewer route beside inspection camera equipment and an unmarked records binder, illustrating the evidence and documents a homeowner keeps at project handover.
Process / field studyHanding over a new sewer line: inspection, records and the warrantyConceptual illustration, not to scale or a site assessment.Read the guide
Short answer

A new sewer line is finished when you hold five things: the permit and inspection record, an after-video from the cleanout to the connection, an as-built sketch with depths and cleanout locations, a written restoration plan for anything still to do, and the warranty in writing. The after-video is the most important: it shows the new line continuous, clean and without standing water, and it becomes the baseline for any future claim.

Key takeaways
  • Do not make the final payment until the closing package is in your hands.
  • Watch the after-video yourself: continuous pipe, clean joints, no standing water, the counter reaching the connection.
  • A warranty should say what it covers (workmanship, materials, restoration, settlement), for how long, and how a claim is made.
  • Ask whether the warranty transfers to a buyer, because the line will usually outlast your ownership.
  • Check the trench after the first spring thaw: settlement shows up then.
A sewer camera cable fed into an open basement cleanout
IllustrationMost scopes start here: the camera cable fed into the main cleanout in the basement.
Sewer camera inspection with locatorA push camera travels through the lateral from a cleanout, lighting the pipe while a footage counter records distance. A sonde in the camera head emits a signal a surface locator uses to mark position and depth. LOCATOR: POSITION + DEPTH REC ●012.4 m LIGHTED HEAD + FOOTAGE COUNTERACCESS: CLEANOUT
Fig. 1A sewer camera records distance on a footage counter while a sonde lets a locator mark position and depth at the surface.

01 /What should I receive when a new sewer line is finished?

The work is not finished when the machine leaves; it is finished when the paperwork arrives. A complete closing package has five parts, and each one answers a question someone will eventually ask: the inspector, an insurer, a buyer's lawyer or the next plumber.

The closing package for a new sewer line
ItemWhat it provesWho needs it later
Permit and inspection recordThe work was permitted and seen open before backfillBuyers, insurers, the municipality
After-videoThe line is continuous, clean and on gradeYou, for any warranty claim; future plumbers
As-built sketchWhere the line runs, how deep, where the cleanouts and connection areAnyone who digs on the lot again
Restoration planWhat is finished and what is still owed, with datesYou, until the last item is done
Written warrantyWhat is covered, for how long, and how to claimYou, and a future owner if it transfers

Ask for all of it in a form you can keep: files and paper copies, not a portal login that may disappear if the company changes hands. Tie the final payment to receiving all five. A reputable contractor expects that and will have most of it ready on the last day; the as-built and the video file sometimes follow within a few days.

02 /How is a new sewer line inspected?

The inspection happens with the trench open, before any backfill, so the inspector can see the pipe, its bedding, the grade and both connections. In Calgary, the City lists a rough-in inspection for homeowner plumbing permits once drainage and venting are installed, and a final inspection once fixtures are ready. For a new service connection, the City says it inspects installations against its standard specifications. Whoever holds the permit books the inspection.

What testing is required is up to the code and the inspector. Ask your contractor before the job starts how the new line will be tested and what the inspector will want to see, and make sure the schedule leaves the trench open long enough. A contractor who backfills before the inspection has removed the only chance anyone had to see the work.

03 /What should I look for in the after-video?

An after-video is a camera run through the new line, recorded once the work is done. You do not need to be an expert to check the basics, and it is worth watching it all the way through with the contractor or on your own before the final payment.

  • The distance counter runs from the cleanout all the way to the connection at the main or property line, and matches the length on the as-built.
  • Continuous new pipe with the same colour and texture throughout, and clean joints with no gaps or lips.
  • No standing water sitting in the pipe beyond a thin film after flushing; a pool that the camera wades through is a sign of a low spot.
  • Clean connections: the joint to the house drain and the tie-in at the far end are smooth, not offset or protruding.
  • No debris: construction sand, rock or concrete left in a new line causes early blockages.
  • The transition where new pipe meets any old pipe left in place is sound, with a proper coupling.
Sewer camera inspection with locatorA push camera travels through the lateral from a cleanout, lighting the pipe while a footage counter records distance. A sonde in the camera head emits a signal a surface locator uses to mark position and depth. LOCATOR: POSITION + DEPTH REC ●012.4 m LIGHTED HEAD + FOOTAGE COUNTERACCESS: CLEANOUT
Fig. 2The after-video uses the same camera as the first scope: a lit view down the pipe with a distance counter, and a sonde that can mark the route on the surface.

Ask for the video file, not just a link that may expire, and keep it with the house papers. If a problem shows up in three years, footage of the same line from day one settles whether it was there from the start.

A sewer camera reel, monitor and locator on a front lawn in autumn
IllustrationA push-camera reel and monitor with the locator receiver, set up on a front lawn.

04 /What should a new sewer line warranty say?

Warranties vary widely, and the length matters less than what is covered and how you claim. Read it before you sign the contract, not after the job, and ask for anything vague to be written down.

Questions to ask about a sewer line warranty
QuestionWhy it matters
Does it cover workmanship, materials or both?Pipe makers warrant the pipe; installers warrant the installation, which is where new lines fail
How long does each part last?Workmanship, restoration and settlement often have different terms
Is trench settlement covered?A driveway or lawn that sinks over the trench is a common complaint
What is excluded?Look for roots at old connections, blockages from misuse, ground movement and other trades
Who pays for the camera run to investigate a claim?A claim usually starts with footage
Does it transfer to a buyer?The line will usually outlast your ownership
How do I make a claim?Contact, response time, and what records you must provide

Be wary of a warranty that promises a lifespan. A well-installed plastic line is designed to last many decades, but a promise of a fixed number of years with no conditions is marketing, not a contract term. Materials and design life are covered in what a new sewer line is made of.

05 /What should I watch for in the first year?

Most problems with a new line show up early, and the first spring thaw is the test. Frost leaving the ground and snowmelt soaking in are when poorly compacted backfill settles.

  1. First weeks

    Drains should run freely. A slow drain or gurgling right after a new line is installed is worth a call to the contractor while it is fresh.

  2. First spring

    Walk the route. A dip in the lawn, a crack in a repoured driveway or a sunken strip over the trench is settlement; report it with photos and dates.

  3. Restoration items

    Check off each owed item, such as spring sod or final concrete after a winter job, against the written plan.

  4. Before the warranty ends

    If anything has seemed off, a camera run before the warranty expires costs little and protects a lot.

In the City road right-of-way, the City of Calgary says contractors are responsible for maintaining trench backfill for two years under an excavation permit. On private property, your warranty sets the terms, which is why settlement belongs in it.

Keep a simple log: the date of any slow drain or backup, what was running at the time, and photos of any settlement. If a claim ever becomes necessary, a dated log and the original after-video make it a short conversation instead of an argument.

06 /How do the records help when I sell?

A buyer of an older house may make the sale conditional on a sewer scope. A house with a recent replacement and a full closing package answers the question before it is asked: permit, inspection, after-video, as-built and a transferable warranty. It turns the sewer line from an unknown into a documented asset.

Keep the package with the other house records and hand it over at closing. The ten-step process shows where each record comes from, sewer lateral replacement describes what a complete job includes, and paying for a new sewer line covers the money side. If you are still at the quote stage, send your details and ask each contractor what their closing package contains.

FAQQuestions people ask

What warranty should a new sewer line have?

One that states in writing what it covers (workmanship, materials, restoration and settlement), how long each part lasts, what is excluded, how to claim, and whether it transfers to a buyer.

How do I test a new sewer line?

The inspector decides what testing is required before backfill. Afterwards, an after-video from the cleanout to the connection is the practical check that the line is continuous, clean and without low spots.

Who inspects a new sewer line in Calgary?

The City, under the plumbing permit. The trench is inspected open, before backfill; for new service connections the City inspects against its standard specifications.

Why does the ground sink over a new sewer trench?

Backfill that was not compacted in lifts settles, especially after the first spring thaw. Report it with photos and dates, and make sure settlement is named in the warranty.

Should I get a copy of the after-video?

Yes, the file itself rather than a link that may expire. It is your baseline for any warranty claim and a useful record for a future sale.

NETWORKGo deeper across the HAUSE Sewer network

Request quotes

Describe the problem once. Get a straight answer.

Send the symptoms and anything you already know — age of the house, what a camera found, what you have been quoted. The HAUSE Sewer desk replies with next steps and, where available, a local contractor for the job.

Sewage backing up right now? Stop using water, keep people away from the water, and do not touch electrical equipment near it.

Tell us about the job

Free request. We read every one and reply by email or phone.

HAUSE Sewer is an independent network, not a contractor. See our privacy notice.

The HAUSE Sewer network

One sewer line, every angle.